Dispatch Notes 4/7

  • Commercial development project start at Little Bear Village

  • Wrapping up Redwood

  • Sewer line installation

  • Mobilizations and Site visits

Jordan, Ryan, Becky, & Jesse in the field

Angoe in the office

Bill, Tristen, and Blake are off

• 0:00 - 0:33

Hey guys. So this is a foundation backfill that we got coming up. We're basically about done with the Redwood backfill. And so this is going to be our next one. This is the Crestwood one where we did the septic. We dug this out last Paul with the large excavator and we'll be getting a shaker head attachment so we can pack into all these nooks and crannies as we're all going to be a big slab. This is a little showcase from, this is a little showcase from a dig that Becky did last fall as well. And this is our three Oh four that's down at the shop right now.

• 0:33 - 0:34

Cause it overheated this morning.

• 0:37 - 1:12

All right. Hey guys, this is Jesse. I'm going to go over dispatch with you guys for tomorrow.

It's going to be April 7th tomorrow. So what we have is Ryan, we'll finish up down below at the Redwood job for Jacques, uh, spread the crushed concrete around and any other touch ups that you can wrap up down there. You might want to start. I don't know, a little bit later just to let the mud dry out a little bit.

• 1:12 - 1:49

Cause you got clay down there. It's going to be a sopping wet mud box. So, you know, if you could let the sun headed for a minute and I have not checked the weather, but I think it's going to be a good warm nice day tomorrow. Anyway, you're going to get things touched up down there. I am going to line out Becky first thing in the morning, let's meet at the shop at seven 30 Becky and we will head over to little bear village where we will start prepping the pads for Dennis's two duplexes that he will be building there.

• 0:00 - 0:00

• 1:51 - 2:36

We're basically going to be removing the top soil and coming back in with structural fill and compacting as we come up and lifts. And uh, that'll be, that'll be that for tomorrow. We'll probably do some utility stub outs into the building as well. So we will talk about that tomorrow. Jordan, you're going to finish up what you had going on there today. Resume work. If you can get me a list in the morning of the remaining materials that you need, I will pick those up in Boulder tomorrow morning and then Ryan will come up and provide some assistance to you once he's done at Redwood.

• 2:36 - 2:49

So Ryan, that'll be your second app. The day assignment will be to head up to Magnolia and help out Jordan. If you, you know, it takes you longer than you think and you can't get up there. It's not the end of the world.

• 2:50 - 3:23

And if Jordan, you know, if you can't make headway without a helper tomorrow, no big deal. We can come back on Thursday and wrap it up over there on Thursday. Right? I think we can get Ryan up there in the afternoon. No, no problem. And you guys should be able to make some good headway up there and Magnolia, I think that's about it. I can't think of anything else. I have some site visits out in evergreen in the afternoon, so I will be on the road in the afternoon and I'll never green.

• 3:23 - 3:55

And other than that, bill, you're going to be off trusting. You'll be off working on railroad cars somewhere and Blake, we're going to keep you waiting in the wings on the sidelines for a little while longer. We'll try to get you going here in a little bit, got a lot of projects ready to pop. So just kind of waiting on weather and that's that I believe that's dispatch.

• 3:56 - 4:23

Becky, I'll see you at seven 30 in the morning at the shop and we'll get ready to start a new project. Oh, wait a minute. We don't have an excavator. So Becky, you're going to have to wait for me to go down to Redwood in the morning and get an excavator from the Redwood job. I'll probably go and grab the Kubota so that we can use the nice big three foot bucket.

• 4:27 - 4:51

So that is going to be that. So Becky, you're going to have a late start tomorrow, probably plan on starting around 10 30 or so. I will call you when I'm heading back up the Hill. That's tomorrow's dispatch. Thank you all for working hard and have a good time out there and be safe.